property managers
schools & Universities
government
contractors
home & business
(0)
Item
/ $0
8:00 AM - 4:00 PM EST (Monday-Friday)
|Hi
Guest
,
Login!
|
(800) 837-8175
Home
>
Fire Alarm Detection Systems
>
Fire Sprinkler Monitoring & Accessories
> Potter OSYSU-1, Outside Stem and Yoke Valve Supervisory Switch, 1 SPDT Contact
Potter OSYSU-1, Outside Stem and Yoke Valve Supervisory Switch, 1 SPDT Contact
Review this item
Add to Wish List
Potter OSYSU-1, Outside Stem and Yoke Valve Supervisory Switch, 1 SPDT Contact
0 Review(s)
0
|
Questions about this item? Be the first to ask here.
Manufacturer
:
Potter Electric
Manufacturer Part#
:
1010102
Our Part#
:
1010102
Stock Status
: Call for Availability
Price
Retail Price:
$142.00
Your Savings:
$32.77
(23%)
Your Price:
$109.23
Quantity
Add to Cart
Feature:
Potter Electric
Feature:
1010102
Feature:
Yes
Feature:
785192000501
Feature 5
Yes
Specifications
GSA
Feature 7
Switch Type:Valve Supervisory Switch|Pipe Type:Steel|Nominal Pipe Size:2 to 12|Mounting Type:Screws|Activation Type:Tamper|Activation Delay (Retard):No|Contact Type:SPDT
Description
Accessories
Product Reviews
Documents
Description
The OSYSU is used to monitor the open position of an OS&Y(outside screw and yoke) type gate valve. This device is available in two models; the OSYSU-1, containing one set of SPDT (Form C) contacts, and the OSYSU-2, containing two sets of SPDT (Form C) contacts. These switches mount conveniently to most OS&Y valves ranging in size from 2" to12" (50mm to 300mm). They will mount on some valves as small as 1/2" (12,5mm).
The cover is held in place by two tamper-resistant screws that require a special tool to remove. The tool is furnished with each device and should be left with the building owner or responsible party. Replacement or additional cover screws and hex keys are available.
Optional Cover Tamper Switch
A field-installable cover tamper switch is available as an option which may be used to indicate the removal of the cover.
Testing
The OSYSU and its associated protective monitoring system should be inspected and tested in accordance with applicable NFPA codes and standards and/or the authority having jurisdiction (manufacturer recommends quarterly or more frequently).
Download the Potter Electric OSYSU-1 Cut Sheet
Recently Viewed Items